BREWHA commercial BIAC brewing system in a working craft brewery

Commercial brewing systems · 1.5–15 BBL

Build a compact commercial brewery. Grow one fermentor at a time.

BREWHA BIAC® systems combine mashing, boiling, fermentation, conditioning, and serving functions in a compact electric platform for pilot breweries, taprooms, brewpubs, and production breweries.

Compare Commercial Systems Request an Itemized Brewery Quote

See how Scott at 3 Dogs Brewing turned a 1,600 sq ft former wine shop into a working brewery and taproom with BREWHA.

  • 1.5–15 BBL range
  • Compact electric platform
  • Expandable fermentation capacity
  • Lifetime support for original owners

Built around the business

Commercial brewery equipment for the way you plan to sell beer.

Start with the operating model, expected sales, production schedule, building, and utilities. BREWHA’s commercial BIAC® range gives pilot breweries, taprooms, brewpubs, microbreweries, and distribution-focused producers a compact path from 1.5 to 15 BBL.

Pilot + startup

Prove the beer and the market.

Develop recipes, open with a focused menu, and protect capital while demand is still being established.

Taproom

Turn freshness into the experience.

Produce rotating beer close to the customer and build the equipment plan around direct sales.

Brewpub

Fit brewing around hospitality.

Preserve space for guests, service, food preparation, storage, and the rest of the venue.

Production brewery

Build repeatable output in stages.

Match batch size and fermentation capacity to packaging, distribution, staffing, and sell-through.

Clear commercial benefits

Less equipment complexity. More room to build the business.

The patented BIAC approach combines core brewing and cellar functions around a removable Mash Colander® and a jacketed, insulated 5-in-1 Fermentor.

01

Use less equipment

Combine core brewing and cellar stages around one integrated vessel platform.

02

Protect floor space

Reduce vessel duplication and preserve room for guests, storage, packaging, or growth.

03

Reduce transfers

Keep more of the batch in the 5-in-1 Fermentor through the selected downstream stages.

04

Control the process

Use electric heat, jacketing, insulation, pressure capability, and compatible controls.

05

Grow one tank at a time

Add compatible fermentation capacity as sales and the beer menu develop.

The BIAC process

One Mash Colander. One five-function vessel.

Mash inside the removable Colander, lift it to separate the wort, then continue the selected downstream stages in the jacketed conical vessel below.

1

Mash

Mash grain inside the removable Mash Colander.

2

Boil

Lift out the grain and boil wort in the vessel below.

3

Ferment

Cool and ferment without a core vessel transfer.

4

Condition

Use temperature and pressure control where configured.

5

Serve

Condition, carbonate, or serve from compatible setups.

Important: the complete system is the production core, not the entire facility. Cooling, water treatment, ventilation, drainage, cleaning, packaging, serving, material handling, and other requirements depend on the brewery plan. See what else your brewery may need →

Compare commercial systems

Five sizes from compact pilot production to distribution scale.

These categories are starting points. Use working volume, brew frequency, fermentation time, beer mix, sales channel, staffing, utilities, and growth assumptions to choose the system.

Person standing next to a 180L 2BBL complete turnkey brewing system

1.5 BBL commercial BIAC®

1.5 BBL 2hL Brewhouse Brewing System and First Fermenter

Beer per batch: 120–180 L / 32–48 US gal

Pilot breweries, tasting rooms, and compact startups

Maximum grain bill
50 kg / 110 lb
Vessel diameter
75 cm / 30 in
Main brewing supply
208 or 240 V · Single phase
Heating power
11 kW
Recommended ceiling
332 cm / 131 in
Full dimensions and utility requirements →

$25,020.00 CAD

Your starting package: one 5-in-1 Fermentor and shared BIAC brewing hardware. Add compatible fermentors to build production capacity.

Configure my 1.5 BBL brewery → View system details →
3BBL 400L turnkey brewing system

3 BBL commercial BIAC®

3 BBL 3.6hL Brewhouse Complete Brewing System and First Fermenter

Beer per batch: 180–360 L / 1.5–3 BBL

Nano breweries and taprooms

Maximum grain bill
100 kg / 220 lb
Vessel diameter
90 cm / 35 in
Main brewing supply
208 or 240 V · Single or three phase
Heating power
22 kW
Recommended ceiling
358 cm / 141 in
Full dimensions and utility requirements →

$32,328.00 CAD

Your starting package: one 5-in-1 Fermentor and shared BIAC brewing hardware. Add compatible fermentors to build production capacity.

Configure my 3 BBL brewery → View system details →
Man standing next to a 5 BBL 6hectoliter turnkey brewing system

5 BBL commercial BIAC®

5 BBL 6hL Brewhouse Complete Brewing System and First Fermenter

Beer per batch: 360–590 L / 3–5 BBL

Brewpubs and growing microbreweries

Maximum grain bill
160 kg / 350 lb
Vessel diameter
110 cm / 43 in
Main brewing supply
208 or 240 V · Single or three phase
Heating power
33 kW
Recommended ceiling
391 cm / 154 in
Full dimensions and utility requirements →

$36,552.00 CAD

Your starting package: one 5-in-1 Fermentor and shared BIAC brewing hardware. Add compatible fermentors to build production capacity.

Configure my 5 BBL brewery → View system details →
Large stainless 7BBL 900L brewing system

7 BBL commercial BIAC®

7 BBL 8hL Brewhouse Brewing System and First Fermenter

Beer per batch: 590–819 L / 5–7 BBL

High-volume taprooms and production breweries

Maximum grain bill
225 kg / 500 lb
Vessel diameter
130 cm / 51 in
Main brewing supply
208 or 240 V · Three phase only
Heating power
47.5 kW
Recommended ceiling
414 cm / 163 in
Full dimensions and utility requirements →

$45,487.00 CAD

Your starting package: one 5-in-1 Fermentor and shared BIAC brewing hardware. Add compatible fermentors to build production capacity.

Configure my 7 BBL brewery → View system details →
15BBL Brewhouse and Fermenter (18HL BIAC Beer Brewing System)

15 BBL commercial BIAC®

15BBL Brewhouse and Fermenter (18HL BIAC Beer Brewing System)

Beer per batch: 1,170–1,760 L / 10–15 BBL

Distribution-focused breweries

Maximum grain bill
480 kg / 1,050 lb
Vessel diameter
158 cm / 62 in
Main brewing supply
208 or 240 V · Three phase only
Heating power
57 kW; 52 kW option available
Recommended ceiling
656 cm / 259 in (workstation gantry)
Full dimensions and utility requirements →

From $67,758.00 CAD

Your starting package: one 5-in-1 Fermentor and shared BIAC brewing hardware. Add compatible fermentors to build production capacity.

Configure my 15 BBL brewery → View system details →

Let BREWHA help turn your selected system into a complete equipment plan. Your itemized proposal confirms package inclusions, additional fermentors, supporting equipment, freight, and delivery timing. Batch yield varies by recipe; allow for working space and Mash Colander lifting clearance. Review full specifications or request your brewery proposal.

Comparing equipment offers?

Make your brewery investment work beyond the purchase.

A used system or factory-direct quote can look attractive on price. BREWHA puts your investment into an integrated brewing workflow, fewer transfers, a compact layout, and a practical path to expansion. See how those advantages can work for your building, your team, and the beer you plan to sell.

Build around the way you want to run your brewery. Put BREWHA’s equipment, operating workflow, and expansion path alongside the offer you are considering.

Compare my project with BREWHA

Brewery sizing tool

What size brewing system do I need?

Work backward from annual production, brew frequency, fermentation time, available equipment area and ceiling height to identify a practical starting system size.

Multiple BREWHA 5-in-1 fermenters showing modular commercial brewery expansion

Modular growth

Add fermentation capacity as demand develops.

A complete BIAC system begins with the shared brewing components and a 5-in-1 Fermentor. Compatible additional fermentors can let the shared Mash Colander, pump, and controller begin another batch while earlier batches continue through fermentation and conditioning.

  • Stage capital around demonstrated demand
  • Add cellar capacity without replacing the core process
  • Plan the beer menu and fermentation schedule together
  • Check utilities, labor, cooling, and packaging at every expansion stage

Build around a practical plan

Choose the system that fits the business, building, and production schedule.

Compare the five commercial BIAC sizes, then confirm the vessel, utilities, supporting equipment, and expansion path with BREWHA.