Production workload
A smaller batch can meet a large annual target only by increasing brew sessions and fermentor count. Size for a schedule your team can consistently operate.
Commercial brewery sizing calculator
Work backward from annual production, weekly workload, available floor space and ceiling height to compare BREWHA commercial BIAC brewing systems.
Start the size calculatorEnter production demand, available equipment area, ceiling height and the brewing schedule you can sustain.
Production + building fit
The calculator checks 1.5, 3, 5, 7 and 15 BBL systems against the same assumptions, then identifies the smallest batch-size option that meets the entered schedule, preliminary equipment-area screen and standard ceiling clearance.
The result will compare production workload, fermentor count, preliminary equipment area and lifting clearance.
| System | Fermentors | Brews/week | Preliminary area | Standard / reduced ceiling | Result |
|---|---|---|---|---|---|
| Complete the calculator to compare all five commercial systems. | |||||
Planning method: Production uses your saleable-yield assumption. Fermentor count is based on brew sessions per week × the complete tank cycle. The preliminary equipment-area screen gives every fermentor its published diameter plus 24 inches / 0.61 m of total planning width and adds 40 sq ft / 3.7 m² for the shared Mash Colander, pump, controller and working position.
Important: This is an early screening estimate, not a dimensioned brewery layout. It excludes room shape, lifting and staging geometry, chilling, utilities, drains, cleaning, ingredients, packaging, customer areas, service access and code-required clearances. Confirm the result with the Brewery Layout Planner and BIAC Specifications before evaluating a lease or installation.
Read the result in context
A smaller batch can meet a large annual target only by increasing brew sessions and fermentor count. Size for a schedule your team can consistently operate.
Tank-cycle time converts weekly brew sessions into occupied vessels. Faster turns reduce tank count; serving directly from a vessel may extend it.
The Mash Colander must lift clear of the fermentor. Ceiling height can rule out a system even when its vessel fits comfortably on the floor.
Continue planning
Test room dimensions, equipment clearances, access and future fermentor locations.
InvestmentAdd equipment, construction, licensing, serving and working-capital assumptions.
ReturnsModel revenue, costs, break-even output, payback and five-year return.
TechnicalConfirm vessel dimensions, pressure ratings, utilities and installation requirements.
EquipmentCompare complete 1.5, 3, 5, 7 and 15 BBL BIAC configurations.
Supporting equipmentPlan chilling, lifting, steam management, cleaning, storage and serving equipment.
Common sizing questions
Begin with realistic annual saleable volume, then divide it by the saleable output per batch and the weeks you expect to brew. Compare the required weekly brew sessions with your staffing plan, and calculate how many fermentors will be occupied during the complete tank cycle.
A larger system reduces weekly brew sessions but requires more ceiling height and larger vessels. Additional fermentors increase capacity and product variety while reusing the BIAC Mash Colander, pump and main controller. Compare workload, space, capital and sales risk together.
This calculator estimates a compact equipment zone only. A complete brewery also needs working aisles, drainage, chilling, cleaning, ingredients, packaging or serving, utilities and future-growth space. Continue with the brewery layout planner before evaluating a lease.
Some facilities may support a reduced-clearance lifting arrangement. Contact BREWHA for details. A conditional calculator result is not confirmation that a system fits a specific building.
Validate your brewery plan
Share the calculator result, building constraints, project stage and production goals. BREWHA can help refine the equipment configuration before you commit to a building or place an order.